Re ECF Project: ECF 2015-61

Project Title: Feasibility of building warm mix asphalt pavements ussing synthetic zeolite derived from sewage sludge ash

Applicant: Dr Zhen LENG, The Hong Kong Polytechnic University

Total Approved Grant: $1,060,240 (ECF & WWGF: 50/50)

Duration: 4/7/2016 to 3/7/2018

Project Status/Remarks: On-going

Scope:
This project aims to convert sewage sludge ash (SSA) to synthetic zeolite which is suitable for producing warm mix asphalt (WMA), a sustainable paving material allowing lower asphalt pavement construction temperatures. Through comprehensive laboratory, in-plant and field study, this project will identify the optimum production conditions to synthetize SSA zeolite with the desired properties as a WMA additive, and assess the environmental and engineering performance of WMA with SSA zeolite. Upon the completion of this project, guidelines on producing SSA zeolite as a WMA additive as well as its associated quality requirement will be developed for asphalt suppliers and Highways Department to use.

Summary of the Findings/Outcomes:
To be available upon completion of the project


 
s